Industries · Door-to-door from China

Machinery and Industrial Equipment Shipping from China

Send each crate’s packed dimensions and gross weight, including its base or skid. Identify the largest and heaviest pieces, then confirm door clearance, loading and site unloading with the responsible providers.

Worker positioning a pallet of cartons at an open shipping container.
Machinery · Packing and delivery

Choose equipment for the packed machine

Check door clearance, load distribution and access at both sites.

Crated LCL machinery

Smaller crates that the consolidation depot can handle and secure safely alongside other cargo.

Standard-container FCL

Machines that clear the actual doors and meet payload, floor-loading and handling limits.

Specialist equipment

Oversize or difficult loads needing a separately assessed equipment, lifting and route plan.

From planning to site delivery

Confirm the responsible provider and agreed handover at each stage.

  1. Define the scope. Identify packages, suppliers, destination, ready date and any required arrival sequence.
  2. Check feasibility. Equipment and handling providers assess fit, load distribution, lifting, route and site access.
  3. Prepare the cargo. Agree packing and corrosion protection; have the loading team confirm blocking, bracing and securing.
  4. Book the movement. Confirm equipment, terminal handling, route requirements and the receiving appointment.
  5. Arrange clearance. Coordinate current commercial and customs records with the importer or broker.
  6. Record delivery. Check package count and condition at the agreed handover point.
Handling equipment lifting a blue Alibaba.com Logistics container.
Blue freight container beneath lifting equipment.

Check the actual container and loading method

Have the equipment provider and loading specialist check door clearance, internal space, payload, support loads and securing points. Allow room for lifting or manoeuvring. If standard equipment fails, assess revised packing or specialist equipment; confirm feasibility and terminal handling before booking. CTU Code packing guidance

Agree loading, unloading and the handover point

At origin, name who supplies the crane or forklift and secures the machine. Confirm terminal lifts separately. At destination, the site and lifting providers must agree truck access, unloading space, equipment, crew and the operating window.

State whether delivery ends on the vehicle, on the ground in a named area, or farther inside the factory. Indoor positioning and installation need separately agreed scope. Record condition and piece count at each handover.

Send the packing drawings and delivery conditions to review the required scope.

Compare complete, feasible plans

Compare the same packed cargo and handover point, including loading, securing, terminal lifts, required permits, delivery and unloading. List outstanding assessments and assumptions. Revised packing or specialist equipment needs a fresh feasibility check before booking; changing equipment does not automatically resolve every constraint.

Check the full delivered cost

Ask for minimum charges, waiting rates and exclusions.

China preparation

Crating, pickup, loading, securing, origin terminal handling and any storage.

International freight

LCL weight or volume, container rate or the agreed specialist transport basis.

Destination delivery

Clearance, terminal lifts, permits where required, delivery, unloading, waiting and empty return.

Size and weight. The largest and heaviest packages may be different. Check every package’s fit and support loads before choosing equipment.

Provide drawings and packing details

Send drawings and photos showing the packed outline, gross weight, base footprint, supports, centre of gravity and applicable lifting or fork points. Include orientation or tilting limits and any fluids or batteries. Ask the manufacturer to resolve missing handling data. For solid-wood crates, skids or dunnage, confirm applicable treatment, marks and destination requirements.

General packing reference: CTU Code quick guide.

Check how each plan is priced

Ask for charges at every transfer point.

OptionConfirmFreight basisOther charges
Crated LCL machineryDepot acceptance, crate weight and shared handling.Weight or volume, plus minimums.Heavy-piece handling, warehouse lifts and delivery.
Standard-container FCLDoor clearance, floor loads and loading access.Container type and route.Loading, securing, terminals, delivery and empty return.
Specialist equipmentEquipment availability, route, lifts and site plan.Quoted equipment, route and handling scope.Surveys, permits, specialist lifts and waiting as applicable.

Send machine details for a quote

Machine and packing

Machine type, package list, drawings and photos, packed sizes, gross weights and value; manufacturer’s handling instructions and any fluids or batteries.

China pickup

Pickup address, contact, ready date, factory access and available loading equipment.

Delivery site

Full address, postcode, contact, gate clearances, truck access, unloading point, available equipment, receiving window and required package arrival order.

Confirm equipment, included services, customs roles, payers, exclusions and the exact handover point.

Send shipment details

Frequently asked questions

Questions about equipment fit, heavy loads and site handover.

Can a crate fit inside but fail to pass through the doors?

Yes. Using the FCL page’s height examples, a hypothetical 2.35 m upright crate is lower than the 2.395 m interior but taller than the 2.292 m door. Width, loading clearance, weight and the actual equipment still need separate checks.

Is staying below the payload limit enough?

No. A heavy machine can overload a small floor area even when total weight is below payload. Have the responsible specialists check support positions, load distribution, centre of gravity, lifting and securing for the actual equipment.

Does factory delivery include moving the machine into position?

Only if expressly included. Agree whether handover ends on the vehicle, on the ground or at a named point inside the factory. Indoor positioning and installation need separately agreed scope, equipment and crew.

Can machinery be delivered door to door from China?

Yes, if equipment, loading, route and site unloading are confirmed as workable. Put equipment, lifting and securing, customs responsibilities, delivery, waiting and unloading scope in the written quote.

What drawings are needed for a heavy machine?

Provide a drawing of the finished package and base, showing supports, gross weight, centre of gravity and lifting or fork points as applicable. Add photographs and handling restrictions. Net machine dimensions from a brochure are insufficient.

What should I check for solid-wood crates?

Identify all solid-wood components and send clear photos of their marks. Confirm destination requirements and arrange any required treatment through an authorised provider, or use compliant replacement packaging. A treatment statement does not replace a required mark.