Crated LCL machinery
Smaller crates that the consolidation depot can handle and secure safely alongside other cargo.
Industries · Door-to-door from China
Send each crate’s packed dimensions and gross weight, including its base or skid. Identify the largest and heaviest pieces, then confirm door clearance, loading and site unloading with the responsible providers.

Check door clearance, load distribution and access at both sites.
Smaller crates that the consolidation depot can handle and secure safely alongside other cargo.
Machines that clear the actual doors and meet payload, floor-loading and handling limits.
Oversize or difficult loads needing a separately assessed equipment, lifting and route plan.
Confirm the responsible provider and agreed handover at each stage.

Have the equipment provider and loading specialist check door clearance, internal space, payload, support loads and securing points. Allow room for lifting or manoeuvring. If standard equipment fails, assess revised packing or specialist equipment; confirm feasibility and terminal handling before booking. CTU Code packing guidance
At origin, name who supplies the crane or forklift and secures the machine. Confirm terminal lifts separately. At destination, the site and lifting providers must agree truck access, unloading space, equipment, crew and the operating window.
State whether delivery ends on the vehicle, on the ground in a named area, or farther inside the factory. Indoor positioning and installation need separately agreed scope. Record condition and piece count at each handover.
Send the packing drawings and delivery conditions to review the required scope.
Compare the same packed cargo and handover point, including loading, securing, terminal lifts, required permits, delivery and unloading. List outstanding assessments and assumptions. Revised packing or specialist equipment needs a fresh feasibility check before booking; changing equipment does not automatically resolve every constraint.
Ask for minimum charges, waiting rates and exclusions.
Crating, pickup, loading, securing, origin terminal handling and any storage.
LCL weight or volume, container rate or the agreed specialist transport basis.
Clearance, terminal lifts, permits where required, delivery, unloading, waiting and empty return.
Send drawings and photos showing the packed outline, gross weight, base footprint, supports, centre of gravity and applicable lifting or fork points. Include orientation or tilting limits and any fluids or batteries. Ask the manufacturer to resolve missing handling data. For solid-wood crates, skids or dunnage, confirm applicable treatment, marks and destination requirements.
General packing reference: CTU Code quick guide.
Ask for charges at every transfer point.
| Option | Confirm | Freight basis | Other charges |
|---|---|---|---|
| Crated LCL machinery | Depot acceptance, crate weight and shared handling. | Weight or volume, plus minimums. | Heavy-piece handling, warehouse lifts and delivery. |
| Standard-container FCL | Door clearance, floor loads and loading access. | Container type and route. | Loading, securing, terminals, delivery and empty return. |
| Specialist equipment | Equipment availability, route, lifts and site plan. | Quoted equipment, route and handling scope. | Surveys, permits, specialist lifts and waiting as applicable. |
Machine type, package list, drawings and photos, packed sizes, gross weights and value; manufacturer’s handling instructions and any fluids or batteries.
Pickup address, contact, ready date, factory access and available loading equipment.
Full address, postcode, contact, gate clearances, truck access, unloading point, available equipment, receiving window and required package arrival order.
Confirm equipment, included services, customs roles, payers, exclusions and the exact handover point.
Send shipment detailsQuestions about equipment fit, heavy loads and site handover.
Yes. Using the FCL page’s height examples, a hypothetical 2.35 m upright crate is lower than the 2.395 m interior but taller than the 2.292 m door. Width, loading clearance, weight and the actual equipment still need separate checks.
No. A heavy machine can overload a small floor area even when total weight is below payload. Have the responsible specialists check support positions, load distribution, centre of gravity, lifting and securing for the actual equipment.
Only if expressly included. Agree whether handover ends on the vehicle, on the ground or at a named point inside the factory. Indoor positioning and installation need separately agreed scope, equipment and crew.
Yes, if equipment, loading, route and site unloading are confirmed as workable. Put equipment, lifting and securing, customs responsibilities, delivery, waiting and unloading scope in the written quote.
Provide a drawing of the finished package and base, showing supports, gross weight, centre of gravity and lifting or fork points as applicable. Add photographs and handling restrictions. Net machine dimensions from a brochure are insufficient.
Identify all solid-wood components and send clear photos of their marks. Confirm destination requirements and arrange any required treatment through an authorised provider, or use compliant replacement packaging. A treatment statement does not replace a required mark.