Factory-to-port FCL
Fits importers with their own destination broker, truck and empty-return arrangement.
Freight services · Door-to-door from China
Send your packing list, factory address and delivery location for an FCL quote. We’ll check container size, loading requirements and the trucking needed at each end.

Choose which stages you need us to arrange.
Fits importers with their own destination broker, truck and empty-return arrangement.
Fits buyers whose supplier already controls China loading and export terminal delivery.
Fits buyers wanting one plan from factory gate to the approved unloading point.
Agree on responsibilities at each stage before booking.

These are Hapag-Lloyd fleet examples. Confirm the actual container’s door opening, internal dimensions and payload before booking. 20ft standard · 40ft standard · 40ft high cube
| Dry container | Inside length × width × height | Door opening width × height | Example maximum payload | When to check this size |
|---|---|---|---|---|
| 20ft standard (20GP) | 5.900 × 2.352 × 2.395 m | 2.340 × 2.292 m | 28,130 kg | For loads that fit the shorter floor and meet route weight limits. |
| 40ft standard (40GP) | 12.032 × 2.352 × 2.395 m | 2.340 × 2.292 m | 28,750 kg | For loads needing more floor space that fit through standard doors. |
| 40ft high cube (40HQ) | 12.032 × 2.350 × 2.700 m | 2.340 × 2.597 m | 28,600 kg | For taller cargo or safe stacking. Check height clearance along the truck route and at both sites. |
A 2.40 m high packed crate exceeds the standard door heights shown. Check high-cube door clearance, including lifting space. If width or weight is the constraint, ask us to review the packing or a split load before booking.
| Handover | What to agree before booking |
|---|---|
| Empty pickup and factory loading | Confirm the trucker, factory access, loading slot and team responsible for loading, securing and sealing. If a container truck cannot reach the factory, ask us to quote cargo pickup and loading at another suitable site. |
| Sealing and port handover | Record the container and seal numbers. Confirm who submits the verified gross mass (VGM), its deadline and who delivers the loaded container before the terminal cutoff. |
| Destination delivery and empty return | Confirm who arranges release, delivery, unloading and empty return, including who obtains the depot’s return receipt. |
Confirm when free time starts, the last free pickup and return dates, and who pays any storage, container-use or truck waiting charges. If unloading is delayed, recheck whether the empty can be returned on time.
Request itemized prices for ocean freight, terminal charges and trucking at both ends.
Empty-container positioning, loading, securing, special equipment and export documents. Confirm any charges for loading delays or missed cutoffs.
Quoted per container size and type. Check which origin and destination terminal charges are included.
Release, delivery truck, appointments, unloading, waiting and empty return. State any site-access restrictions.
Before gate-in, we confirm the named shipper, approved VGM method, submission responsibility and cutoff, alongside loading and seal records. Tell us whether pallets, crates or dunnage contain regulated solid wood so we can check the packing evidence before loading.
Operational reference: IMO verified gross mass guidance.
Confirm the start and end points, customs roles and any additional charges in writing.
| Service | Pickup point | Delivery point | Responsibilities to confirm |
|---|---|---|---|
| Factory-to-port FCL | Factory loading site | Destination port | We coordinate positioning, loading, export handover and ocean freight. You arrange destination clearance, trucking and empty return. |
| Port-to-door FCL | Origin export terminal | Agreed unloading site | Your supplier arranges loading and terminal delivery in China. We coordinate ocean freight, destination release, trucking and empty return. |
| Door-to-door FCL | Factory loading site | Agreed unloading site | We coordinate both ends and ocean freight. Confirm loading, customs and unloading responsibilities, delivery appointments and empty return. |
Packing list with package count, packed dimensions and gross weight, plus stacking limits, required orientation and loading requirements.
Factory address, cargo-ready date, truck access and available loading equipment. State any origin transport already arranged.
Delivery address, receiving slot, unloading equipment and allowed unloading time. State who will arrange destination clearance, trucking and empty return.
Tell us which service scope you need. The written quote should list included work, customs responsibilities, charging terms and possible extra costs.
Send shipment detailsNot through the 2.292 m standard door examples listed here. A 40 ft high-cube example has a 2.597 m door opening, but the upright crate also needs handling clearance during loading. Verify the actual assigned container, packed width and weight, lifting method and route limits before confirming that it fits.
No. A high cube adds height, while floor length is similar to a standard 40 ft container. Non-stackable pallets that fill the floor leave no extra positions. Check layout, permitted orientations, packaging strength and weight limits.
The booking terms determine who pays. Confirm the return depot, last free return date and responsibility for extra charges, then obtain the depot’s return receipt.
Yes. We can arrange factory positioning, ocean freight, destination delivery and empty return. Confirm who loads, clears and unloads the container, and have waiting, storage, special equipment and return charges stated in the quote.
Under SOLAS, the shipper named on the transport document must provide VGM in time for vessel loading. We record the accepted weighing method, submission party and carrier cutoff. Agree in writing before gate-in on any terminal weighing service, including availability, cost and responsibilities.
Yes, where destination or transit rules apply to solid-wood packaging. Send treatment-mark photos and identify pallets, crates, blocking and dunnage. We check for unclear or missing evidence and may request treatment or replacement. A supplier’s statement alone does not prove the wood will be accepted.