Freight services · Pre-dispatch checks

Cargo Inspection & Repacking

Ask AndaFreight about carton checks, relabelling or repacking before shipping from China. Send the packing list, carton numbers and required work. We’ll check availability and confirm the scope, cost and records for your approval.

Forklift lifting yellow shipping crates beside a flatbed truck.
Inspection · Relabelling · Repacking

Choose the check or packing work

Choose the work needed to decide whether the cargo can ship.

Count and mark check

Check received carton numbers, total count and visible damage against your packing list.

Photo or visible-condition check

Answer a specific question about visible features or approved sample units.

Relabel or repack

Correct labels or packaging under an approved instruction.

From inspection instructions to release

Confirm the written scope, named approver and cost before work starts.

  1. Agree the scope. Identify the supplier, purchase order, carton numbers and required checks or changes.
  2. Check receipt. Record count and visible condition; hold packages with mismatched references or quantities.
  3. Carry out approved work. Follow the agreed check or packing instructions and take the required photos.
  4. Resolve exceptions. Report discrepancies and obtain written approval for additional work and costs.
  5. Verify changed packages. Recount, remeasure and reweigh; update labels, the packing list and any affected freight charges.
  6. Confirm release. Identify cartons approved to ship, keep held goods separate and supply the agreed records.
Blue warehouse racks holding wrapped cargo and boxes.
Large wrapped equipment stored beside warehouse racks.

Decide what should be checked

CheckWhat to agree before work starts
Carton count, marks and visible conditionCompare expected and received carton numbers, counts and visible condition. Record missing or duplicate marks and photograph affected cartons. Matching totals do not prove every carton number is correct.
Opening specific cartonsSpecify carton numbers, items or quantities to check, photos and resealing instructions. Record which cartons were opened and the findings for each. An outside check does not verify contents.
Product testing or compliance checksProvide the test or acceptance criteria. A qualified provider must separately confirm the scope and report; visual checks do not certify product safety or compliance.

Combining orders from several suppliers? Confirm receiving, storage and release arrangements. See receiving and release for consolidated cargo

Resolve missing, mislabelled or damaged cartons

  1. Record the difference. Record the purchase order, count, condition and photos of original marks or damage. Hold duplicate-marked cartons separately, each with a temporary reference linked to its photo and location. Keep original marks visible; ask the supplier to verify identity against packing records.
  2. Approve the exact work. The named approver must authorise the work and cost in writing. Identify cartons by their original or temporary reference; attach approved label files or packing instructions. Get specific approval before opening and keep unidentified cartons on hold. For possible claims, preserve original packaging and ask the claims contact about inspection before changing or discarding it.
  3. Verify before release. Link original, temporary and new carton references to the purchase order and before-and-after photos. After repacking or reinforcement, record final package count, outer dimensions and packed gross weight. Update the packing list, check effects on freight and service, and identify released versus held cartons.

Confirm the price and records

Ask for itemised charges for receiving and segregation, checks or photos, opening and resealing, labour, materials, labelling, remeasurement, disposal and storage, where applicable. Confirm whether charges are per carton, pallet, visit or hour. Check extra handling and revised freight costs, plus any effect on the dispatch cutoff while awaiting approval.

The written confirmation should name the operator, receiving point, cartons covered, agreed work, completion date and records supplied. Check that the work can finish before dispatch.

Approve the checklist before work starts

Approve the checks, sample quantity, acceptance criteria, photos and packing requirements before work starts. Confirm any requirements for replacement wood, package marks and the planned transport mode. A sampling instruction does not replace separately commissioned testing or certification.

Operational reference: Maersk packaging responsibility.

Compare scope, records and costs

Confirm what will be checked, which records you will receive and how the work is charged.

ServiceCheck or work scopeRecords to requestCharging basis
Count and mark checkExternal count, carton marks and visible condition.Expected versus actual count, missing or duplicate marks, damage photos.Agreed visit, package or time; extra discrepancy work separately.
Photo or visible-condition checkSpecified surfaces or sample units; opening only if authorised.Carton references, photos, findings and what was not checked.Agreed labour time and packages or samples checked.
Relabel or repackApproved label file, protection or replacement packaging.Old-to-new references, before-and-after photos, final count, dimensions and weight.Labour, materials and any disposal, storage or revised freight charges.

Send your inspection or repacking instructions

Shipment and carton IDs

Supplier, purchase order, packing list, carton numbers, expected count and cargo location.

Checks or packing changes

Checks, sample quantity, photos, label files or packing changes required. Specify permitted openings and resealing.

Approver and deadline

Named approver, written decision rules, target completion date and dispatch deadline.

We’ll check availability and provide the scope, cost and records for approval.

Send inspection instructions

Frequently asked questions

Does a carton count prove the products inside are correct?

No. An external check confirms the packages and visible marks within its agreed scope. If 20 cartons arrive, their contents are still unverified unless opening or unit counting was commissioned. Specify which carton numbers to open, what to count or photograph, who approves the work and how the cartons must be resealed.

What happens when two cartons have the same mark?

Hold both affected cartons and give each a temporary handling reference linked to its photograph and location. Keep the original marks visible. Ask the supplier to identify each package from its records; if opening is necessary, obtain specific approval. Matching the total carton count alone does not resolve a duplicate identity.

Can repacking change the freight price?

Yes. New packaging can change dimensions, packed gross weight and package count. Remeasure the finished shipment and update the packing list. Confirm any effect on chargeable weight, handling or the booked service before release.

Can inspection or repacking be arranged before dispatch?

Ask before dispatch so we can check availability and timing. Specify the work, carton references, approver and acceptance criteria. Obtain written scope and cost confirmation, including any storage or freight changes.

Can a warehouse inspection confirm product safety or legal compliance?

A visual warehouse check cannot certify product safety or compliance. It records only the agreed counts, marks, visible features or samples. Testing requires a separately defined service, qualified provider, criteria and report.

Who approves disposal or replacement of damaged packaging?

The named buyer contact must authorise replacement or disposal and its cost in writing. Preserve goods, original labels and evidence until approval; for possible claims, ask the claims contact before changes or disposal. Link old and new carton references and remeasure repacked goods.

WhatsApp Chat with us