Commercial Shipping Packaging Guide

Plan packaging for the actual pickup, transfers and delivery. Before sealing, have the packer confirm protection, load support and restraints for the goods and handling method.

Cargo packed in timber frames along both sides of a warehouse aisle.

Match protection to the goods

Concern What to check with the packer
Fragile parts or finishes Separate and cushion items, protect projections and prevent movement. Match carton strength to packed weight.
Heavy or top-heavy freight Have a competent packer specify the base and anchoring. Confirm load capacity, fork access, lifting points and any offset centre of gravity.
Moisture-sensitive goods Agree moisture protection, dry packing conditions and storage before collection.
Non-stackable goods Confirm carrier acceptance and extra space or handling charges before pricing. Mark the restriction.

Keep cartons within the pallet footprint and secure the load. If goods extend beyond the base, have the packer resolve support and protection and obtain carrier acceptance for the arrangement. Supply maximum dimensions and photos. Confirm wood materials and destination requirements with the importer. FedEx freight packing guidance

Photograph and measure before collection

Photograph internal cushioning and restraints before sealing, then all sides of the finished package and its marks. Record each unit’s maximum outer dimensions and gross weight, including the base and wrapping. Match package IDs and counts to the packing list.

If two cartons become one crate, update the count, measurements, weight and marks. Confirm revised freight, lifting and unloading arrangements before release.

Send packing details and handling questions

Three checks

Check protection, handling and measurements

Confirm these before approving the finished pack.

Protect

Protection against movement, impact and moisture.

Handle

Stable base, accessible lifting points and known stack limits.

Measure

Finished unit dimensions, gross weight and count.

Loading and delivery

Match the package to the site

Check access and handling capacity at both pickup and delivery sites before booking. Confirm equipment and the people responsible for each lift.

Agree unloading. Record who provides equipment and labour, the receiving slot and charges. Door-to-door service does not automatically include unloading.

Cargo ship with its own cranes beside rows of dockside containers.
Share handling restrictions with each transfer and delivery team.

From packing to receipt

Check packing and record handovers

  1. Specify Give the packer product risks, weight and the planned handling method.
  2. Inspect Check cushioning and restraints against the agreed specification; photograph them before sealing.
  3. Record Match finished counts, dimensions, weights and marks to the packing list.
  4. Approve changes Agree repacking instructions, costs and revised freight before collection.
  5. Check handovers Record package IDs, condition and exceptions at collection and delivery.
  6. Retain evidence Keep signed delivery records and damage photos; preserve affected packaging for any required inspection.

Packing and freight costs

Price the finished package

Check packing costs and any changes to freight or handling. For oversize, non-stackable or special-handling charges, identify the affected unit and charging basis.

Volume example: For 20 loose cartons, increasing each from 50 × 40 × 30 cm to 55 × 45 × 35 cm raises total volume from 1.20 m³ to about 1.73 m³. Request an updated quote.

Empty container with corrugated side walls and a worn floor.
Packed dimensions affect equipment fit and freight charges.

Before booking

Confirm the pack before dispatch

Common mistakes

  • Quoting product dimensions without packaging.
  • Leaving goods unsupported beyond the pallet edge.
  • Leaving unloading equipment or responsibility unconfirmed.

Send these details

  • Package count, maximum dimensions and gross weight per unit; flag estimates.
  • Supplier pickup details, loading access and ready date.
  • Delivery address, postcode, receiving hours, access and deadline.
  • Goods, package type, damage risks and stack limits.
  • Photos, lifting instructions and available loading and unloading equipment.

How AndaFreight can help

AndaFreight can check supplied packing information, coordinate carrier acceptance and quote agreed work. The shipper remains responsible for suitable packaging; load-bearing design and lifting plans require confirmation by competent specialists.

Confirm these results before release

Cargo conditionPackaging decision
Stackable cartonsPacker-confirmed stack limits, secured load and readable marks.
Fragile or irregular piecesPhotos of agreed cushioning and restraints, plus documented handling restrictions.
Heavy or site-delivered cargoConfirmed lifting method, suitable equipment at both ends and assigned unloading responsibility.

Discuss packing and handling. Confirm the work, charges and release approval in writing.

Frequently asked questions

Should I measure cartons or the loaded pallet?

Measure the unit the carrier receives. For a loaded pallet, include the base, wrapping and any protrusions in its maximum dimensions. A 120 × 100 × 150 cm loaded pallet occupies 1.8 m³. Do not add the enclosed cartons’ volume again.

Is a “do not stack” label enough?

No. Confirm carrier acceptance and any extra charges before booking. The packer must still provide suitable protection and restraints. A label communicates a restriction; it does not establish load-bearing strength or replace an agreed handling plan.

Does every wooden pallet need an ISPM 15 mark?

No. Packaging made wholly from qualifying processed wood, such as plywood, is exempt from ISPM 15. Check any solid-wood components separately and confirm destination requirements. Where required, use compliant treated and marked packaging from an authorised source.

Who confirms heavy-cargo loading and unloading?

Competent specialists confirm load capacity and lifting requirements. The shipper provides accurate weights, lifting information and loading access; the receiver confirms equipment, labour and site conditions. AndaFreight coordinates these details with the carrier and confirms the quoted unloading scope.