Standard containers
For cargo accepted within standard container and handling limits, with suitable pickup and site access.
Logistics solutions · Door-to-door from China
Plan equipment deliveries around the installation sequence. Identify which parts must arrive together, when the site can receive them and who will unload them. Confirm any specialist handling and route requirements before dispatch.

Confirm the transport plan, then decide whether one movement or several phases suit the installation.
For cargo accepted within standard container and handling limits, with suitable pickup and site access.
For oversized, heavy or awkward packages, after qualified providers confirm equipment, handling, route and site feasibility.
Use either transport plan to send usable installation lots when the site can receive them and earlier work justifies the extra cost.
Confirm the responsible parties before booking each movement.

Example: three suppliers have the base, machine body and control cabinet. The installer needs the base and fixing kit first, the body at a later unloading slot, and the cabinet before commissioning. Set actual dates from the project drawings and installation schedule.
| Lot | Ready to ship when | If the plan changes |
|---|---|---|
| Base and fixing kit | Both packages are identified and ready; the site can receive them for the installer’s confirmed work stage. | If fixings are missing, ask the installer to approve a substitute or revise the lot and date. |
| Machine body | The transport and handling plan, receiving crew and unloading slot are confirmed. | Check storage and rehandling costs if the machine would arrive before the site can accept it. |
| Control cabinet and accessories | Commissioning parts are listed and a receiver is assigned to check the accessories. | Confirm the latest required arrival and whether a separate shipment would protect commissioning. |
For each heavy or unusual package, send measured packed dimensions, gross weight, drawings, photographs, base footprint and any overhang. Obtain the manufacturer’s handling information, including centre of gravity, support surfaces, lifting and securing points as applicable. The carrier and handling teams assess fit, loads, access and route.
The site contact should confirm gate and vehicle access, receiving position, delivery window and unloading responsibilities.
Send your equipment and installation schedule to AndaFreight. Identify what must arrive first and which operations still await approval.
Compare one complete movement with the combined cost of all phases. Include repeated pickups, lifts, documents, clearance, storage and site deliveries. Split when the first lot enables useful work and the benefit justifies the extra cost.
Ask for an itemised quote and identify who pays for possible changes.
Factory collection, packing, loading, lifting, securing and origin storage.
Container or specialist equipment, main freight and terminal handling. Confirm the charging basis and any minimums.
Clearance, applicable duty and tax, delivery, unloading and any required permits, escorts or cranes. Check waiting, storage and empty-return costs.
Have the manufacturer confirm handling data and qualified providers confirm lifting, load distribution and securing plans. A freight quote does not reserve a crane or approve engineering calculations. Report changes to weight, dimensions, drawings, equipment, route or site slot. Pause the affected movement until the responsible parties confirm the revised plan.
General packing reference: CTU Code quick guide.
Phased deliveries can use standard or specialist transport. Price all lots in the plan.
| Plan | Confirm first | Costs to include | Decision to make |
|---|---|---|---|
| Standard containers | Container fit, loading method, securing and site access. | Equipment, freight, terminals, delivery and empty return. | Can the complete movement use accepted standard handling? |
| Specialist transport | Provider approval of equipment, route and site work. | Specialist vehicles, equipment, lifts, permits and escorts where required. | Are the necessary providers and operations confirmed before booking? |
| Phased deliveries | Dependencies, ready dates and site windows for each lot. | Repeated pickups, handling, clearance, storage and deliveries. | Does earlier usable equipment justify the extra overall cost? |
Package IDs, counts, packed dimensions, gross weights, drawings, photographs and manufacturer’s handling information.
Each factory’s address, contact and ready date; items needed together and current loading arrangements.
Actual address, postcode, site contact, access limits, receiving area and unloading arrangements; each lot’s required arrival and receiving window.
Ask for included operations, responsible providers, charging bases, customs roles, payers, pending approvals and conditions that can change the total.
Send shipment detailsQuestions about installation sequence, handling and site delivery.
No. Follow the installer’s required sequence. The base and fixing kit may be needed together, while the control cabinet can follow before commissioning. Give each package an ID, dependency and required arrival date.
No. The responsible providers must confirm the equipment, crew, site access and unloading slot. Obtain confirmation of each required operation before releasing the affected shipment; a transport estimate alone does not reserve lifting resources.
Recheck changed packed dimensions, weight, drawings, vehicles, route access or site slots. One coordinator should send revisions to the factory, carrier, handling teams and installer. Confirm the updated plan and any storage or waiting charges before the affected movement proceeds.
Yes, if they form a usable installation lot and the site can receive them. Compare the combined cost of the urgent lot and remaining equipment, including repeated pickups, documents, clearance, handling, lifts and deliveries.
They help providers assess stability and how weight acts on supporting surfaces. Supply the manufacturer’s data and drawings so the responsible teams can check equipment, load distribution and securing. Total weight alone is insufficient for those checks.
The manufacturer confirms equipment-specific handling points; qualified lifting and securing providers confirm methods and calculations. Coordinate acceptance with the carrier, terminal and site. Photographs alone are not engineering approval, and equipment changes require the affected plan to be reviewed.